Effiwaste: Boosting Zero Waste
Marianna Tsitoura
1 year before
1) Could you please specify the spatial requirements of your proposed solution? How much physical space will be needed, and where is this space expected to be located ?
Javier Jiménez Rodríguez
1 year before
Edited
We use two different technologies, Effiwaste as tech device to measure and reduce food waste and, Efficompost, as organic composter. The measures are the following:
- Effiwaste devide to measure: 70x80 cm (balance) and one All-in-on PC fixed to the wall (15,6"). It is usually located in the kitchen or in the composter zone.
- Effi composter: 100x100x150 cm. Usually located at the waste deposit.
- Effiwa-
Marianna Tsitoura
1 year before
Edited
2) Will your system include sensors to monitor the fill level of waste bins? If so, how will these sensors be protected during routine waste collection operations to prevent damage (e.g., during emptying or mechanical handling of the bins)?
Javier Jiménez Rodríguez
1 year before
Edited
IT is not mandatory to use sensors, since could be monitored by balance level. In case of using sensors, these are volumetric sensors protected by small iron coverage.
Marianna Tsitoura
1 year before
3) Could you provide details regarding the maintenance requirements of your system, its expected lifespan, and its resilience to environmental or operational conditions?
Javier Jiménez Rodríguez
1 year before
The device does not need any maintenance, just an internet connection in order to make the usual uploadings. In case of the composter, it does not need any special maintenance apart from add 15% of "dry vegetable structuring agent" and 85% of organic waste. The lifespan of both solutions is 7-10 years.
The device could be used at any dry condition, with temperatures between -10ºC - 45ºC, as any usual computer. The composter, works at any condition, in the same temperature.
The
Marianna Tsitoura
1 year before
4) Could you please clarify what the final deliverables of your proposal will be?
Javier Jiménez Rodríguez
1 year before
Phase-Based Deliverables
Phase 1 – Project Kick-off
➤ Kick-off & Coordination Document
Includes a detailed implementation schedule, definition of KPIs, roles and responsibilities, and internal reporting structure tailored to the hotel operations.
Phase 2 – Baseline Audit
➤ Waste Mapping & Baseline Audit Report
Provides a comprehensive analysis of current food waste generation across procurement, kitchen, buffet, and plate levels in three hotel sites. Establishes the initial KPI benchmark.
Phase 3 – Device Installation
➤ Smart Devices Setup Report
Confirms the successful delivery, installation, and calibration of three IoT-enabled waste measurement scales. Includes user access setup and basic training summary.
Phase 4 – Software Deployment
➤ Effiwaste Platform Configuration Report
Details the full deployment of the data analytics platform, including active dashboards, predictive modules, alert systems, and menu optimization tools.
Phase 5 – Training Program
➤ Training Completion & Certification Report
Summarizes online and onsite training sessions, with lists of participants, completed modules, issued certifications, and feedback results from hotel staff.
Phase 6 – Composting System Setup
➤ Composting Units Deployment File
Documents the installation of three odorless composters, with photos, maintenance protocols, signage deployed, and usage plan (e.g., for landscaping or donation).
Phase 7 – Operational Support
➤ Monthly Monitoring Reports
Includes analytics on waste generation trends, system usage, and recommended adjustments. Delivered monthly over six months with insights for continuous improvement.
Phase 8 – Final Impact Audit
➤ Post-Implementation Impact Assessment
A data-driven report quantifying waste reduction, cost savings, methane emissions avoided, and operational efficiency improvements compared to the initial baseline.
Phase 9 – Scalability & Closure
➤ Scalability Roadmap & Executive Presentation
Provides strategic recommendations for system replication across additional properties, along with a summary slide deck for internal and external stakeholders.
Global Final Deliverables
A. Comprehensive Technical Report
Complete documentation of all technologies deployed, operational processes, training actions, and results across all phases.
B. Financial Summary Report
Overview of project costs, savings achieved, and ROI estimates over time.
C. Stakeholder Presentation Materials
Ready-to-use materials for hotel executives, ESG committees, and partners, including visuals, KPIs, and sustainability highlights.
D. Replication & Scalability Plan
Custom roadmap for expanding the solution to other properties, including necessary resources, timelines, and expected impact.