Share:
Summary
The proposed solution by Effiwaste includes three main pillars:

Effiwaste Software Platform:
A smart software that collects and analyzes data on organic waste generation across different hotel departments. Through IoT sensors and manual input, the system monitors food waste at various stages—preparation, service, and post-consumption. It uses predictive analytics to suggest operational changes, menu optimization, and inventory management improvements, reducing waste at the source.

Onsite Composting System:
A compact and modular composting unit is installed within the hotel premises, allowing for on-the-spot transformation of organic waste into usable compost. This reduces reliance on external waste removal services and encourages circularity in operations, e.g., using compost in gardens or community projects.

Specialized Training Program:
A comprehensive training plan for hotel staff via Effiwaste’s proprietary e-learning platform, covering waste identification, segregation, reduction strategies, and use of the software and compost system. In-person workshops are also conducted during implementation for seamless integration into hotel workflows.

The modularity of the system allows for deployment even in hotels with limited space or in highly urbanized zones.
Foreseen impact
Foreseen impact of the solution proposed:
Waste Reduction: 30–70% reduction in organic waste generation within 6–12 months, based on past deployments.

Cost Savings: Up to 25% reduction in food purchasing costs by eliminating inefficiencies in the kitchen and stock management.

Operational Efficiency: Real-time dashboards and alerts lead to faster decision-making and improved coordination between departments.

Sustainability and Reputation: Hotels gain competitive advantage through sustainability certifications, ESG reporting, and improved guest perception.

Environmental Impact:

Drastic reduction in methane emissions due to less landfill waste.

Carbon footprint lowered via reduced transport and waste handling.

Compost reuse supports soil regeneration and urban greening.
About the solver
Effiwaste: Who We Are
Effiwaste is a Spanish technology company specialized in the hospitality and tourism industry, focusing exclusively on organic food waste prevention and valorization. We operate mainly in the Mediterranean region and the Canary Islands, where high tourism pressure meets strong sustainability needs.

Implemented in Leading Hotel Chains:
Effiwaste has been successfully adopted by mora than 10 hotel chains:
- Adrián Hoteles, Dreamplace Hotels, Grupo Blaumar, Evenia Hotels, Seaside Collection, HECANSA, Hotel Tigaiga, Hotel Tecina, Palladium Group...

These implementations provide proven case studies with measurable reductions in waste and cost.

Awards and Recognition:
Effiwaste has received multiple awards for innovation in tourism and environmental impact:
- UNTWO Hospitality Challenge Finalist
- Startup of the year by La Nave
- Selected by LabE Digital Gastronomhy Lab from Basque Culinary Center
- AMT Smart Destinations Awards Finalist
- Madrid Impacta awardad

In adittion Effiwaste is working on three European Fund Projects for the MICE & Tourism sector at the Cross Retour, Befuture & Futourism program.

More info at:
- www.effiwaste.com
- youtube.com/@effiwaste
- linkedin.com/company/effiwastetech
Indicative budget/Phases
Implementation Phases & Timeline

1. Phase 1: Project Setup and Coordination
Kick-off with hotel management teams.
Definition of waste reduction goals, KPIs, and reporting structure.

Configuration of hotel-specific dashboards.
- Duration: 2 weeks
- Cost: Included in general management

2. Phase 2: Baseline Audit and Waste Mapping
In-depth audits in 3 hotels to analyze current waste at procurement, storage, kitchen, buffet, and plate level.

KPI baseline established.
- Duration: 1 month
- Cost: 4.500 € (1.500 € per hotel)

3. Phase 3: Installation of 3 Smart Measurement Devices
Delivery and setup of 3 IoT-enabled food waste scales.

Includes dashboard integration, user interface configuration, and initial testing.
- Duration: 2 weeks
- Cost: 4.500 € (1.500 € per device)

4.Phase 4: Effiwaste Software Platform Deployment
Custom implementation of Big Data & predictive analytics platform.

Connection of devices, menu optimization modules, and alerts.

- Duration: 2 weeks
- Cost: 5.000 €

5. Phase 5: Specialized Training (Online + Onsite)
Access to Effiwaste’s e-learning platform for hotel staff across roles.

Onsite training sessions to reinforce digital and operational adoption.

Includes certification of participants.

- Duration: 1 month
- Cost: 4.000 €

6. Phase 6: Installation of 3 Odorless Onsite Composters
Deployment of 3 odorless composters (600 kg capacity each).

Includes training, signage, and maintenance setup.

- Duration: 1 month
- Cost: 13.500 € (4.500 € per unit, upgraded features)

7. Phase 7: Operational Support and Optimization
Monthly monitoring, waste analytics reviews, and reporting.

Suggestion of operational adjustments based on real-time data.

- Duration: 6 months
- Cost: 2.000 €

8. Phase 8: Final Impact Audit
Post-implementation waste audit to compare results.

Environmental, operational, and economic impact quantified.

- Duration: 2 weeks
- Cost: Included

9. Phase 9: Reporting and Scalability Roadmap
Delivery of final technical and financial report.

Recommendations for extending the system across more properties.

Presentation to stakeholders.

- Duration: 2 weeks
- Cost: Included